The two hydropower potentials, Tasersiaq (07.e) and Tarsartuup Tasersua (06.g), are located between Kangerlussuaq and Nuuk. Together, they constitute Greenland's largest and most investigated hydropower potentials, with a total installed capacity of approx. 1,100 MW and an expected annual energy production of approximately 9,600 GWh.

 Tasersiaq has an estimated capacity of approximately 820 MW, while Tarsartuup Tasersua has an estimated capacity of approximately 280 MW.

 The hydropower potentials are expected to be exploited through the establishment of water reservoirs by damming existing high-altitude lakes located at elevations of 650–700 metres. The catchment areas are connected to the Greenland Ice Sheet, and the majority of the water resources originate from glacial meltwater.

 In connection with the final tender, tenderers will be able to submit up to three separate bids:

  • One bid for Tasersiaq (07.e).

  • One bid for Tarsartuup Tasersua (06.g).

  • One combined bid for both hydropower potentials.

Each bid must include at least one offtake project capable of utilizing the energy produced.

Qualification Requirements for Prequalification

To be considered for prequalification, applicants must meet a number of minimum requirements, which are specified in greater detail in the prequalification documentation (the "RfQ"), within the following four areas:

 1. Economic and Financial Standing

The applicant must demonstrate sufficient financial strength, including a total net worth of at least DKK 10 billion and an average annual turnover of at least DKK 3 billion over the past three financial years. Requirements are also imposed regarding the equity ratio or credit rating.

 

2. Relevant Project Experience

The applicant must demonstrate experience in the development, planning, construction and operation of:

  • At least one major hydropower plant with a capacity of at least 50 MW.

  • At least one relevant offtake project with a need for energy supply.

The reference projects must demonstrate experience in, among other things, project development, regulatory and permitting processes, procurement, construction, installation, as well as operation and maintenance.

3. Integrity and Legal Compliance

The applicant must demonstrate that its tax and VAT affairs are in good order and must not be subject to sanctions or have any circumstances that may pose a risk to national security, public order or public safety. Furthermore, requirements apply regarding the demonstrated integrity of the applicant and any supporting entities.

 

4. Health, Safety and Environment (HSE)

The applicant must have satisfactory systems in place for quality assurance, occupational health and safety, and environmental management, and must be able to document compliance with applicable legislation, regulations and standards.

 All minimum requirements must be documented through relevant financial statements, project references, declarations and other supporting documentation, as further described in the RfQ. The requirements apply to all relevant members of consortia and any external entities whose technical capabilities or financial capacity the applicant relies upon in its application.

 In addition, an investment screening process will be carried out for all applicants (and again in connection with the submission of final bids).

 

Confidentiality

The applicant and its employees must treat the RfQ and all information relating to the tender confidentially. Similarly, Naalakkersuisut will treat the applications as confidential, as further described in the the RfQ.

 

Information on Payment, Access to Documentation and Deadline

Fee: A fee of DKK 225,000 (two hundred and twenty-five thousand Danish kroner) will be charged for access to the RfQ.

If an applicant pays the aforementioned fee, receives a copy of the RfQ and submits a prequalification application that meets the minimum qualification requirements but is not selected for prequalification, the fee will be refunded.

 

Method of Payment: The fee must be transferred to:

Greenland Self-Government

Grønlandsbanken

IBAN account number: GL456471-1000028

SWIFT address: GRENGLGX

Payment reference: GLN5790001955588

 

Ordering the Documentation: Once the fee has been paid, access to the documentation may be requested by sending an email containing proof of payment of the fee to pan@nanoq.gl. Access to the RfQ (and subsequently also the tender documentation) will then be provided via the EU-Supply platform.

 

Application Deadline: 1 May 2027 at 12:00 noon (Greenlandic time).

 By submitting a prequalification application, the applicant simultaneously applies for a preliminary investigation licence.

Fees will be charged for the application and issuance of such licence, cf. Government of Greenland Executive Order No. 21 of 17 June 2022 on fees for licences and reimbursement of expenses incurred in the processing of cases relating to preliminary investigations and the exploitation of hydropower resources for energy production. Further guidelines and the applicable procedures are set out in the RfQ.